Review Working at Heights SWMS

Review the SWMS information below before signing this SWMS. If you see any issues or require clarifcation, please contact Timothy Greenham | 0421004002 | tim@emeraldbuild.com.au.

Work details

Site / work area
All sites
Trade
Carpenter / Joiner
Task
Roof framing / Trusses
HRCW categories
  • A person could fall more than 2m
  • There have been structural alterations that require temporary support to prevent collapse

Responsible person

Timothy Greenham

Director

Identified hazards and risks

  • Falls from roof or scaffold
  • Trusses falling during installation
  • Struck by crane load during truss delivery
  • Cuts from power saws
  • Heat stress when working in sun
  • Slip or trip on elevated platforms
  • Injury from overreaching or excessive bending
  • Ejection from work platforms or machinery
  • Collapse of temporary structures
  • Injuries from handling structural components

Risk control measures

  • Fall protection in place before roof access
  • Brace trusses as they are installed - never leave unsupported
  • Stay clear of crane swing area during lifts
  • Keep hands clear of saw blade
  • Take regular water breaks
  • Installation of guardrails and safety nets
  • Ensuring stable work platforms
  • Mandatory use of personal protective equipment (PPE)
  • Use of tool lanyards to prevent dropped objects
  • Safe handling practices for structural components
  • Continuous monitoring of structural integrity
  • Identification and safe management of hazardous materials

How controls will be implemented

  • Harness anchor points checked before starting
  • Truss bracing plan reviewed with crew
  • Exclusion zone around crane operations
  • Monitor weather - stop work in high winds
  • Safety training for all workers involved in height work
  • Implementation of a buddy system for continuous monitoring
  • Emergency response planning and drills
  • Use of lifting aids and team lifting for heavy components
  • Implementation of a structural monitoring program
  • Hazardous materials training and emergency response planning